Bosch DPH30652UC Installationshandbuch Seite 10

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 32
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 9
10
Top
outlet
Top
screw
location
Square
slot
bottom fixing
screws locations
Top
screw
location
Rear
outlet
7 1/2"
W
Z
K
Knockouts
(junction
box)
Wall Mount Installation
Note: see below if cabinet installation is
preferred
4. After the hood installation height has been
determined draw a horizontal line at a
distance above the cooktop equal to the
desired hood installation height plus 7- 1/
2”. See also Figure 6a.
5. Find the centerline of the cooktop.
Draw a vertical line along this centerline up to
the horizontal line drawn in step 1 and draw a
vertical line right and left at a distance of
12-5/8” to determine the mounting location
of the mounting hooks shipped with the hood.
6. Fit two mounting hooks on the wall to hang the
hood through the provided slots (2 wall
anchors+2 hooks + 2 screws 5x35).
7. Run 8” Duct , long enough to reach the
transition once the hood has been installed plus
1 1/2” inch to connect ductwork.
Fix Duct to transition with screws and seal with
tape.
8. Remove 1 of 2 knockouts and install 1/2”
conduit connector in j-box.
9. Hang the hood and adjust its position through
the screws on the hooks.
10.Fix the hood to 4 additional point,2 on upper
side, 2 on lower side (use 4 wall anchors + 4
washers + 4 screws 5x35.
11. Vertical discharge
Cabinet Installation:
Note: see above if wall mount installation is
preferred
Note: distances on Table 3.
4. Find the centerline of the cabinet bottom. Draw
a line along this centerline from rear to front of
the cabinet.
5. Draw two lines, one at a K distance from the
wall, the other one at a Z distance from the
previous line.
Mark 4 points , two along each line at a distance
of half W from the center line, to determine the
screw locations.
6. Fit 4 screws on cabinet bottom do not tighten
completely but leave a space of about 1/2” from
cabinet bottom surface and head screws.
7. Run 8” Duct , long enough to reach the
transition once the hood has been installed plus
1 1/2” inch for connect ductwork.
8. Remove 1 of 2 knockouts and install 1/2”
conduit connector in j-box.
9. Hang the hood on screws through side slots
provided on hood top.
Tighten the four screws.
Note: If possible fix the hood on the wall at 4
additional point (2 on upper side, 2 on lower
side).
10.From the inside of the cabinet attach the
transition on upper outlet (vertical discharge -
see also „Assembly of the 8” Transition“ on
previous pages)
HOOD WIDTH DIM. "W" DIM. "K" DIM. "Z"
30" 29 - 1/8" 2 - 1/2" 7 - 1/16"
36" 35 - 1/16" 2 - 1/2" 7 - 1/16"
Table 3
Side slot x 4
Figure 6b
K
CL
Z
W
CL
Screw for
cabinet
bottom
installation
Hook for wall
installation
Adjusting
screw
25 3/16"
7 1/2"
Bottom of the Hood
12 5/8"
12 5/8"
Figure 6a
Seitenansicht 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 31 32

Kommentare zu diesen Handbüchern

Keine Kommentare