poured in lifts greater than three tiers in
height.
R. All surface areas which are disturbed or damaged
during excavation and placement must be restored
to their original condition or better.
S. All conduit trenching shall be filled and tamped
in 12" lifts to prevent settling.
T. Surplus material must be removed by the
Contractor.
-END OF TECHNICAL SPECIFICATION –
Kommentare zu diesen Handbüchern