1System Hardware Installation
Unpack equipment and verify that there is no damage.
•Set applicable CPU DIP switches to activate
desired features.
• If applicable, install bay into EIA 19-inch rack
(remember to remove the rubber bumper foot
pads).
•Connect camera inputs and monitor outputs to
appropriate connections on equipment bay(s).
•Connect system keyboards, any alarm
connections, and any signal distribution
connections to bay.
• Apply main AC power to the equipment.
•Verify proper system operation, then begin
appropriate programming.
2Satellite Configuration Hardware Installation
Main Site:
• Install Allegiant Series bay and appropriate
accessory products accordingly. Verify biphase
control code line is run to each satellite site.
•Attach trunk line inputs, local camera inputs, and
monitor outputs to the Allegiant Series bay. Apply
main AC power to the equipment.
•Program the Camera ID table via the MCS or
GUI software.
•Switch all unused monitor outputs located at the
main site to display a local camera input.
Satellite Site(s):
•Install the satellite switcher and appropriate
accessories.
•Connect the biphase code line to LTC 8780 Data
Converter and configure it to the desired satellite
address and the switcher’s baud rate.
• If necessary, program the satellite switcher for the
appropriate camera titles, and any other related
requirements.
3 Programming Via System Keyboard
• Enter the system time (User Function 7) and date
(User Function 8) and Camera ID titles (User
Function 9. If desired, adjust the monitor overlay
displays (User Functions 4, 5, and 6 or, 24, 25 and
26).
• Enter the desired Sequences.
•Configure and test the alarm response mode.